canyonwalker: wiseguy (Default)
[personal profile] canyonwalker
The work crew was in our house again Wednesday. Recall that on Day 1, Tuesday, they stripped the tile off the floor to repair the leak damage underneath. Today they laid the new tile.

New tiles in the bathroom, no grout yet (Oct 2025)

The tiles still have spacers between them (those little plastic loops) because the mortar underneath them is still drying. The hole in the floor over toward the left side is where the toilet drain flange will be installed and the toilet will sit.

Pantry ceiling and walls patched from pipe leak, not repainted yet (Oct 2025)

Downstairs they patched up the bits of ceiling and wall they cut open to repair damage from the leak. The drywall patches look great. I mean, they're not painted yet, so that part doesn't look great, but the workmen did a fine job of mudding and sanding the gaps between drywall pieces that it looks smooth and continuous. Once they repaint— which is planned for Monday— this area will look like nothing ever happened.

Profile

canyonwalker: wiseguy (Default)
canyonwalker

January 2026

S M T W T F S
     1 2 3
4 5 678910
11121314151617
18192021222324
25262728293031

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 7th, 2026 03:05 pm
Powered by Dreamwidth Studios